Protecting Hong Kong's Cultural Heritage for Decades
Archaeological Assessments Ltd
2/F 27C Tai Wan Old Village
Yung Shue Wan
Lamma Island, Hong Kong SAR
Hong Kong
ph: 852 2982 4189
fax: N/A
alt: 852 9408 0457
julie
Agreement No. CE 10/2015 (CE) Preliminary Feasibility Study of Cable Car System from Ngong Ping To Tai O, and Spa and Resort Development at Cheung Sha and Soko Islands – Feasibility Study (Civil Engineering and Development Department 2019) [CHIA]
Outlying Islands Sewerage Stage 2 - Upgrading of Tai O Sewage Collection, Treatment and Disposal Facilities (Drainage Services Department 2016) [CHIA]
Agreement No. CE27/2015(CE) Technical Study on Reclamation at Lung Kwu Tan - Feasibility Study (Civil Engineering and Development Department 2015) [Terrestrial AIA & BHIA]
Agreement No. CE1/2013 (CE) Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery – Design and Construction. Environmental Impact Assessment Report (Civil Engineering and Development Department 2016) [CHIA]
Agreement No. CE 42/2013 (CE) Preliminary Feasibility Study on Developing the New Territories North (Planning Department and Civil Engineering and Development Department 2014) [CHIA]
Agreement No. CE 57/2011 (DS) Drainage Improvement at Northern New Territories - Package A, Drainage Improvement Works in San Tin (Remaining Works) – Investigation (Drainage Services Department 2014) [CHIA]
Agreement No. CE 51/2013 (HY) Widening of Western Section and Eastern Section of Lin Ma Hang Road - Design and Construction (Highways Department 2013) [CHIA]
Development of Organic Waste Treatment Facilities, Phase 2, Environmental Impact Assessment (Environmental Protection Department 2013) [CHIA]
Agreement No. CE 65/2006 (DS) Port Shelter Sewerage Stage 2 and Stage 3, Design and Construction, Environmental Impact Assessment (Drainage Services Department 2013) [CHIA]
Agreement No. CE 38/2008 (HY) Trunk Road T2, Environmental Impact Assessment (Civil Engineering and Development Department 2013) [CHIA}
Outlying Island Sewerage Stage 2 - Upgrading of Cheung Chau Sewage Collection, Treatment and Disposal Facilities (Drainage Services Department 2013) [CHIA]
Agreement No. CE43/2010 (HY) Central Kowloon Route – Design and Construction, Environmental Impact Assessment (Major Works Project Management Office, Highways Department 2013) [CHIA]
Consultancy Agreement No. NEX/2301, South Island Line (East), Environmental Impact Assessment (MTR Corporation Limited 2010) [CHIA]
Consultancy Agreement No. NEX/2207, Kwun Tong Line Extension, Environmental Impact Assessment (MTR Corporation Limited 2010) [CHIA]
Agreement No. CE 1/2008 (WS) Improvement of Fresh Water Supply to Cheung Chau – Investigation (Water Supplies Department 2010) [CHIA]
Agreement No. CE 60/2005 (TP) Land Use Planning for the Closed Area –Feasibility Study (Planning Department 2010) [CHIA]
Agreement No. CE52/2007 (HY) Tuen Mun - Chek Lap Kok Link – Investigation (Highways Department 2009) [BHIA]
Construction of a Secondary Boundary Fence and New Sections of Primary Boundary Fence and Boundary Patrol Road. Environmental Impact Assessment (Secretary for Security 2009) [CHIA]
Agreement No. CE 35/2006 (CE) Kai Tak Development Engineering Study cum Design and Construction of Advance Works – Investigation, Design and Construction (Civil Engineering and Development Department 2008) [CHIA]
Consultancy Agreement No. NEX/2301, West Island Line, Environmental Impact Assessment (MTR Corporation Limited 2008) [CHIA]
Agreement No. CE43/2005 (EP) Harbour Area Treatment Scheme (HATS) Stage 2A, Environmental Impact Assessment Study – Investigation (Drainage Services Department 2008) [BHIA]
Agreement No. CE 55/2006 (EP) Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir - Environmental Impact Assessment – Investigation. Environmental Impact Assessment Report (Water Supplies Department 2008) [CHIA]
Proposed Development at Fung Lok Wai, Yuen Long at Lot 1457 R.P. in D.D.123 (Mutual Luck Investment Limited 2008) [CHIA]
Consultancy Agreement No. NEX/1034, Tsim Sha Tsui North Station Northern Subway, Environmental Impact Assessment (MTR Corporation Limited 2008) [CHIA]
Agreement No. CE 42/2006 (TP) Planning Study on Liantang/Heung Yuen Wai Cross-boundary Control Point and its Associated Connecting Roads in Hong Kong – Feasibility Study (Planning Department 2008) [CHIA]
Agreement No.CE25/2001, Hong Kong 2030: Planning Vision and Strategy, Strategic Environmental Assessment (Planning Department 2007) [SEA]
Construction, Decommissioning of the Former Kai Tak Airport other than the North Apron, Environmental Impact Assessment (Civil Engineering and Development Department 2007) [CHIA]
Agreement No. CE20/2004 (EP) North East New Territories (NENT) Landfill Extension. Environmental Impact Assessment Report (Environmental Protection Department 2007) [CHIA]
Agreement No. CE 6/2002 (DS) Environmental Impact Assessment, Drainage Improvement in Northern New Territories – Package C, Investigation, Design and Construction (Drainage Services Department 2007) [CHIA]
Agreement No. CE 67/98, Yuen Long, Kam Tin, Ngau Tam Mei & Tin Shui Wai Drainage Improvement, Stage 1, Phase 2B – Kam Tin Secondary Drainage Channel KT13, Environmental Impact Assessment (Drainage Services Department 2006) [CHIA]
Repositioning and Long-Term Operation Plan of Ocean Park, Environmental Impact Assessment (Ocean Park Corporation 2006) [CHIA]
Proposed Extension of Public Golf Course at Kau Sai Chau Island, Sai Kung, Environmental Impact Assessment (The Hong Kong Jockey Club 2005) [CHIA]
Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel (Drainage Services Department 2005) [BHIA]
Kowloon Southern Link, KSL GSA 5100 Environmental Impact Assessment & Associated Services, Environmental Impact Assessment (Kowloon Canton Railway Corporation 2005) [CHIA]
Agreement No. CE 49/2002 (DS) Drainage Improvement in Southern Lantau – Investigation, Environmental Impact Assessment (Drainage Services Department 2005) [CHIA]
Agreement No. CE 66/2001(EP) EIA and TIA Studies for the Stage 2 of PWP Item No. 215DS - Yuen Long and Kam Tin Sewerage and Sewage Disposal (YLKTSSD) Environmental Impact Assessment (Drainage Services Department 2004) [CHIA]
Improvements to San Tin Interchange (Highways Department 2004) [CHIA]
Agreement No CE 11/2002 (DS) Drainage Improvement in Sai Kung – Design and Construction, Environmental Impact Assessment (Drainage Services Department 2004) [CHIA]
Agreement No. CE 75/2002 (WS) Extension of Siu Ho Wan Water Treatment Works – Investigation, Environmental Impact Assessment (Water Supplies Department 2004) [CHIA]
Tung Chung - Ngong Ping Cable Car Project (MTR Corporation Limited 2003) [CHIA]
Improvement to Tung Chung Road between Lung Tseng Tau and Cheung Sha (Highways Department 2002) [CHIA]
Agreement No. CE 16/99 Feasibility Study for Housing Development at Whitehead and Lee On in Ma On Shan, Sha Tin. Environmental Impact Assessment (Territory Development Department 2002) [CHIA]
Agreement No. EA990008, Sheung Shui to Lok Ma Chau Spur Line, Environmental Impact Assessment (Kowloon-Canton Railway Corporation 2002) [CHIA]
Agreement No. CE 73/98 Investigation Assignment for Widening of Tolo Highway/ Fanling Highway between Island House Interchange and Fanling, Environmental Impact Assessment (Highways Department 2000) [CHIA]
Tuen Mun Sewerage - Eastern Coastal Sewerage Extension. Environmental Impact Assessment (Drainage Services Department 2000) [CHIA]
132 kV Overhead Pole Line & Underground Cable from the Existing Po Lam Substation to the Existing Tui Min Hoi Substation - Circuit No.2 (CLP Power Hong Kong Limited 1999) [CHIA]
Infrastructural Works for the Proposed Development at Telegraph Bay - Engineering Feasibility Study (Information Technology and Broadcasting Bureau of the Government for the Hong Kong Special Administrative Region Department 1999) [CHIA]
East Rail - Extension - Hung Hom To Tsim Sha Tsui - Environmental Impact Assessment (Kowloon-Canton Railway Corporation 1999) [CHIA]
Copyright 2020 Archaeological Assessments Ltd. All rights reserved.
Archaeological Assessments Ltd
2/F 27C Tai Wan Old Village
Yung Shue Wan
Lamma Island, Hong Kong SAR
Hong Kong
ph: 852 2982 4189
fax: N/A
alt: 852 9408 0457
julie